The pump station requirement
The agreed work was to install two new 230V pumps and a new 230V twin-pump control system at a foul-water pumping station in Hampshire.
Treating the pumps and controls as one installation allowed the complete twin-pump arrangement to be checked together after the replacement work.
Twin-pump and control-panel installation
The engineering team installed both new foul pumps in the wet well and fitted the replacement twin-pump control panel in the site enclosure.
The completed job record confirms that the new pumps and panel were tested and that everything was working at the end of the visit.
Recorded outcome
- Two pumps installed: two new 230V foul pumps were fitted in the pump station.
- Controls replaced: a new 230V twin-pump control panel was installed.
- Complete system tested: the pumps and panel were checked together after installation.
- Working at handover: the job record confirms that everything was tested and working.