Pre-installation review
Check drawings, chamber interfaces, access and equipment schedule.
Pump station installation and commissioning covering pumps, guide systems, discharge pipework, valves, control panels, level controls and alarm functions.
Installation must be coordinated with chamber construction, access, lifting, cable ducts, kiosk position, incoming drainage and the rising-main connection.
We define the equipment boundary before works start so chamber supply, civils, electrical supply and M&E responsibilities are clear.
Commissioning checks the complete operating sequence rather than only confirming that each pump turns.
Check drawings, chamber interfaces, access and equipment schedule.
Install pumps, guide rails, couplings, pipework and valves.
Connect panels, sensors, floats, alarms and motor protection.
Test levels, duty rotation, alarms, valves and discharge.
Send the station drawings, pump and panel information, fault history or proposed duty for a technical review.
A clear installation sequence reduces clashes between chamber, pipework, kiosk, cabling and lifting requirements. Equipment should be checked against approved drawings before delivery.
Commissioning should include rotation, current draw, operating levels, duty and standby changeover, alarm operation, non-return valve function and the agreed discharge checks.
Send the latest drawings, equipment schedule, programme, electrical details and site access information before installation planning.
Review equipment, civils, electrical and access interfaces.
Complete mechanical and electrical works to the agreed scope.
Check components, controls, alarms and operating sequence.
Provide the agreed commissioning and equipment records.
Whether you’re planning a new installation, replacing an existing pump or need expert advice, our engineers are here to help.
Trusted by residential, commercial and industrial clients across the South of England.
Related support for design, installation, repair, maintenance and system improvement.
Related Alton Pumps support for this pump-station requirement.
01
Related Alton Pumps support for this pump-station requirement.
02
Related Alton Pumps support for this pump-station requirement.
03
Related Alton Pumps support for this pump-station requirement.
04Send the information you have and we will identify the correct next step.
The technical scope is based on the hydraulic duty, equipment, site constraints, operational risk and agreed delivery boundary.
Review equipment, civils, electrical and access interfaces.
Complete mechanical and electrical works to the agreed scope.
Check components, controls, alarms and operating sequence.
Provide the agreed commissioning and equipment records.
Pumps, controls, valves, access and discharge equipment are considered together.
Any civil, drainage, electrical-supply or tankering boundary is stated clearly in the quotation.
We supply, install and repair leading pump manufacturers including Grundfos, Flygt, Xylem, Wilo, Lowara, DAB, HOMA, HCP, Faggiolati, Tsurumi.
Common questions about scope, technical information and delivery.
The boundary is agreed per project. We can supply packaged systems and complete the M&E installation; excavation, concrete and drainage works may be by others or separately coordinated.
The chamber, access, cable ducts, kiosk base, incoming drainage, rising main and electrical supply should match the agreed drawings and programme.
Yes, control panels, level controls, alarms and associated interfaces can form part of the agreed installation.
Checks can include pump rotation, current, operating levels, duty changeover, alarms, valves, discharge and control settings.
Yes. Existing dimensions, duty, guide systems, pipework, controls and safe access must be reviewed first.
Send the site and station information for review.