Rising main installation · Bagshot area, Surrey

Rising main and valve chamber installation near Bagshot

Alton Pumps installed a new 90 mm MDPE rising main of about 50 metres from a pump station to a 450 mm public sewer, built a new valve chamber with new valves and commissioned the system.

Project completed June 2025

New valve chamber with non-return and gate valves beside a new pump chamber near Bagshot
The new valve chamber with non-return and gate valves.

The requirement

The job was to install a new rising main from a pump station to the public sewer. The team attended site with the plant and labour needed for the work.

Rising main and sewer connection

The engineers installed a new 90 mm MDPE pump main from the pump station to a 450 mm sewer, a run of approximately 50 metres. The sewer is on the other side of a brook, so a cast iron waterway crossing was constructed.

New black 90 mm pipe laid in a trench
The new 90 mm pipe in its trench.

Valve chamber and guide rails

A new valve chamber was built next to the new pump chamber to take the new 90 mm pipe. New non-return and gate valves were installed in it, and the pipework was connected to the new guide rail systems inside the pump chamber.

Guide rails, lifting chains and pumps inside a new pump chamber
Guide rails, lifting chains and pumps inside the pump chamber.

Commissioning and finish

The system was connected from the pump chamber to the main sewer and commissioned. The site was raked over and left as found.

New chamber cover at ground level with the pipe trench beside it
The new chamber cover with the trench beside it.

Recorded outcome

  • Rising main: about 50 metres of 90 mm MDPE pipe installed to a 450 mm sewer.
  • Waterway crossing: a cast iron crossing was built over the brook.
  • Valve chamber: new chamber with non-return and gate valves.
  • Commissioned: connected to the guide rail systems and the main sewer, and the site left as found.

This case study is written from the completed job record. Photographs are from the job. Customer names and addresses are not published.

About this job

How long was the new rising main?

About 50 metres of 90 mm MDPE pipe, from the pump station to a 450 mm sewer.

Why was a waterway crossing needed?

The sewer is on the other side of a brook, so a cast iron waterway crossing was constructed.

Was the system commissioned?

Yes. It was connected from the pump chamber to the main sewer and commissioned, and the site was left as found.